Goodhue Office Remodeling
Hay Creek Mutual started construction of a 32x46
addition to our office building on August 19, 2002. The office was
designed in 1986 for five desks. We now have ten people who work in the
building. The building is crowded to the point that we have one person
working at a desk in the hallway and another working at a computer in the lunch
room. The new addition will add four offices.

On Friday, Sept. 30, we backfilled the walls. By Friday, Sept 6, the
outside walls were up and the roof was shingled. This part of the
construction seems to go fast.

By Monday, August 19th, the trees and shrubs were gone. The backhoe did
the excavation for the footings. Concrete should show up on Tuesday.

The picture above is taken from Broadway, looking west. The picture below is
taken from 2nd Ave., looking towards the south.

All the trees and shrubs on the right hand side of
the picture will have to be removed. The bench will have to go too.
We hope to be able to save the ash tree located between the bench and the
building.
Check back here often to see more pictures of the
construction.